Most of the anxiety in building a home comes from not knowing what happens next. Here is the whole sequence, in order, with the two points where you walk the house yourself.

Step by step

From pre-qualified to keys in hand.

Eight stages, roughly seven months on an average plan. You will hear from your builder at each one, and you walk the house twice before you own it.

  1. Get pre-qualified

    Before anything else, find out what you can comfortably carry. A preferred lender will give you a written pre-qualification in a day or two, and it decides which communities and plans are worth your time.

    An entry hall with a console table, mirror and light wood floors.
  2. Choose a homesite and plan

    Walk the community, stand on the lot, look at where the sun comes from. Then pick the plan that suits it. Corner lots, marsh views and cul-de-sacs each ask something different of a floor plan.

    A grey shingled home with wood garage doors set among mature trees.
  3. Personalise at the design studio

    One appointment, roughly three hours, with a designer who knows what the plan will take. Cabinets, counters, flooring, tile, lighting and fixtures are all settled here so nothing is guessed at later.

    A kitchen with a marble waterfall island and pendant lighting.
  4. Pre-construction meeting

    You meet your builder on the homesite before a shovel moves. We walk the plot plan, confirm the elevations and selections, and agree the schedule. Everything after this is execution.

    A white and black modern farmhouse with a covered entry and two-car garage.
  5. Site work and foundation

    Permits, clearing, grading and the slab or crawlspace. This is the stage most affected by weather, and the one where a straight, level start pays for itself for the next fifty years.

    A pool and patio at dusk with lounge seating and the house beyond.
  6. Framing and the pre-drywall walk

    The house goes up in days and suddenly reads as rooms. Before insulation closes the walls we walk you through the frame to see the wiring, plumbing and duct runs while they are still visible.

    An entry with a staircase and double doors onto the garden.
  7. Finishes and inspections

    Insulation, drywall, trim, cabinets, counters, paint, flooring and fixtures, with third-party and municipal inspections at each stage. Your selections stop being a spreadsheet and start being a house.

    An open living room with an arched doorway and wide plank floors.
  8. Orientation and closing

    A full walkthrough of the finished home, systems and all, with a written list of anything to put right before you sign. Then closing, keys, and the thirty-day and eleven-month visits that follow.